These easy to follow step-by-step instructions will guide you through every step of the installation process of the SquidGee Dry System.
Download a PDF version of the SquidGee Dry Installation Guide to print out and have beside you when installing the system. (Download the latest version of Adobe Reader)
See all of the installation steps in video: basement waterproofing installation videos
13. Install Corners
Inside corners are easy to install when dropped down from the top. Use a coarse sandpaper to rough up any vinyl to vinyl surfaces. Apply SquidGee SealOnce on both main sections and the bottom of the corner piece. |
14. Seal Edges of the Corners
Sealing the edges of the Corners and caulking the bottom will insure there are no leaks. |
15. Caulk Floor Joint
Caulk the floor joint with enough pressure to force some SquidGee SealOnce under the system. VERY IMPORTANT STEP to creating a watertight seal! |
16. Directing Water to a Floor Drain
Be sure and check your local building codes before draining to a floor drain. |
17. Directing Water to a Sump Pump
Draining to a Sump Pump in most communities is the proper method of disposing of ground water. |
18. Paneling the Walls
Attach your 2"x 2" base plate to the wall 1/2" above the SquidGee Dry system. Run all furring strips down to the base plate. Panel only down to the base plate. Attach the base to the base plate to cover the SquidGee Dry™ system. Learn how to finish basement... |